Owner: Greer Steel

Use: Tank, Steel Fabrication

Location: Lakewood, WA

Size: 4,500 sq ft

Design Professional: Sitts & Hill Engineers

 

In 2014, Greer Steel decided to expand its existing fabrication facility In Lakewood.  Mountain was hired to make a small addition to their existing buildings as well as to erect a new stand-alone building to contain a complete sandblast and paint operation.  The new building was designed and constructed to house all of the equipment required to apply high-end coatings to tanks up to 70 ft. long.

Erica Stupfel

e*design Creative Services specializes in making professional design available to small companies and individuals. I understand the importance in brand identity and how a positive visual representation of your product or service can make the difference between success and failure. Your ideas and vision combined with my marketing and design expertise will be a sure success story.

https://www.edesigncreative.com
Previous
Previous

Nordlund Boat Expansion

Next
Next

TRA Medical Imaging Headquarters