• Owner

    Greer Steel
  • Use

    Tank, Steel Fabrication
  • Location

    Lakewood, WA
  • Size

    4,500 sq ft
  • Design Professional

    Sitts & Hill Engineers

In 2014, Greer Steel decided to expand their existing fabrication facility In Lakewood.  Mountain was hired to make a small addition to their existing buildings as well as to erect a new stand-alone building to contain a complete sand blast and paint operation.  The new building was designed and constructed to house all of the equipment required to apply high end coatings to tanks up to 70 ft. long.

Back To Industrial